Traffic Operations
DESIRED IMPACT:
To design, operate, and maintain a cost-effective, Countywide traffic signal system that will reduce travel time and
delay for motorists. This will include operation and maintenance of the new US 19 Advanced Traffic Management
System (ATMS) presently under construction by the Florida Department of Transportation. Maintain roadway
lighting on some County arterial roads. To perform various traffic studies in response to citizen requests; to
support the traffic signal system, the Engineering Services Division, and the Growth Management Division. To
maintain a computerized Countywide accident records system and prepare reports on accidents.
OPERATIONAL GOALS AND PROGRAMS:
The Signal Unit of the Traffic Operations Division is responsible for operation and maintenance of all traffic signals
in Pasco County. All construction of traffic signals by outside contractors for the state and County is inspected by
the Signal Unit prior to acceptance. A technician is on call 24 hours a day, seven days a week, to respond to all
emergencies. All maintenance and construction is performed to strict Federal and State standards.
The Traffic Studies Unit conducts traffic counts, speed studies, accident analysis, and other data collection. This
information is used to identify hazardous locations and make recommendations for improvements. This unit also
inspects all traffic control devices installed in conjunction with subdivision and roadway construction.