NOTE:  All reports include graphic content, most take a while to download.

Approved Route Studies

Items in black are not available electronically

Approval Date

Bell Lake Rd from Alpine Road to Sable Ridge Subdivision Final Route Study
07/26/05

Boyette Road
from SR 54 to Overpass Road
Final Route Study

2/24/04

Centennial Road @ U.S. 301

08/07

Chancey Parkway
from SR 581 to Morris Bridge Road
Final Route Study

2/24/04

Christian Road
from Powerline Road to US 301
Final Route Study

1/23/02

Clinton Avenue Extension
from east of McKendree Road to east of Pasadena Road
Final Route Study

8/24/04

Clinton Avenue
from SR 52 at Prospect to US 301
Final Route Study

6/19/01

Collier Parkway
from Hale Road to Parkway Blvd
Final Route Study

7/16/02

Collier Parkway
from Parkway to Ehren Cutoff

Final Route Study


Phase I Contamination Assessment

7/29/03

Colony/Coyote Roads
from SR 52 to CR 578

Final Route Study

9/24/02

CR 54
from SR 56 to North of Magnolia
Final Route Study

8/26/03

CR 578 / County Line Road (Hernando)
from US 19 to US 41

Preliminary Engineering Report

Appendix A

MPO 4/03

Curley Road
from SR 54 to north of Overpass Road
Final Route Study

2/24/04

Curley Road
from north of Overpass Road to SR 52
Final Route Study


11x17 graphics
Appendix A - Drainage
Appendix B - Traffic Memorandum
Appendix C - Natural Environment
Appendix D - Curtural Resources
Appendix E - Contamination Assessment
Appendix F - Construction Cost Estimate

3/22/05

Curley Rd. S. from SR54 to North of Wells Rd Final Reevaluation Route and Pond Study
Appendix A

10/25/05

East Road
from north of Sherman Drive to County Line Road Final Route Study and Pond Siting

12/07/04

Frazee Hill Road Pond Siting Report

4/10/07

Frazee Hill Road
from 14th Street to US 301

Final Route Study Report

12/16/03

Gateway Boulevard Extension Route Study

3/13/07

Gunn Highway (County Road 587) Route Study

5/23/06

Hale Road
from Collier Parkway to Parkway Blvd
Final Route Study

9/17/02

Kossik Road / Otis Allen Road
from Ft. King Hwy to Wire Road
Final Route Study

1/15/02

Lake Patience Road
from Kristen Lane (Oakstead) to US 41
Final Route Study

6/08/04

Moon Lake Road
from Decubellis to SR 52
Final Route Study


Moon Lake Road
from Decubellis to SR 52
Re-evaluation Route Study

5/22/03


1/11/05

Morris Bridge Road (C.R. 579)
from Pasco/Hillsborough County Line to North of S.R. 54
Final Route and Pond Study

1/23/07

Old Pasco Road
from Quail Hollow Blvd to SR 52
Final Route Study

5/06/03

Osteen Road
from Plathe Road to Orchid Lake Boulevard
Final Route Study

12/07/04

Overpass Road
from Old Pasco Road to Ft. King Highway
Final Route Study

Alignment O-1
Alignment O-2
Alignment O-3
A - Preliminary Drainage
B - Traffic
C - Natural Environment
D - Cultural Resources
E - Contamination Screening
F - Estimates and Engineering Information

4/26/05

Perrine Ranch Intersections
with Grand Boulevard and Seven Springs Boulevard
Final Route Study

Perrine Ranch Road
from Grand Boulevard to Seven Springs Boulevard
Final Route Study

2/8/05

Penny for Pasco 10 Intersection Improvements

SR 52 at Prospect/Happy Hill Roads
Final Route Study

Pond Siting Concepts

Congress Street/Orchid Lake Road/Pine Hill Road
Final Route Study


Grand Boulevard at Trouble Creek
Concept Plan
- No R/W required.

Grand Boulevard at Moog Road
Concept Plan
- No R/W required.

SR 54 at the Boyette Road Relocated
Final Route Study


Grand Boulevard at Mile Stretch Road
Final Route Study


US 19 at Fox Hollow Boulevard
Concept Plan
- No R/W required.

Regency Park Boulevard at San Miguel Drive
Final Route Study


Collier Parkway at Weeks Boulevard
Concept Plan
- No R/W required.

Little Road at Ponderosa
Concept Plan
- No R/W required.

4/5/05

Penny for Pasco Roadway Improvements

Final Route Study of Main Street (From Congress Street to Rowan Road)

Pond Siting Analysis for Main Street (From Congress Street to Rowan Road)

6/27/06

Ridge Road
from Broad Street to Moon Lake Road
Final Route Study

5/22/01

Ridge Road Extension
from Moon Lake Road to CR 583/Ehren Cutoff
Final Route Study


Alternative Site Analysis September 2001
Contamination Screening Report
Archaeological Report
Wetland Report
Wildlife Report

10/14/97

Shady Hills Rd @ Peace Blvd. Final Intersection Report

12/06/05

Shady Hills Road from SR 52 to North County Line
Final Route & Pond Study

4/24/07

SR 52 SEIR from I-75 (SR 93) to E. of Emmaus Cemetery Road Final State Environmental Impact Report

Preliminary Engineering Report
Air Quality Memorandum
Noise Study Report
Cultural Resources Report
Traffic Report
Location Hydraulics Report

08-23-05

SR 54 SEIR
from west of SR 581 to east of Curley Road

Preliminary Engineering Report


State Environmental Impact Report
Air Quality Report
Contamination Screening Report
Endangered Species Biological Report
Final Pond Siting Report
Wetland Evaluation Report

12/16/03

SR 54 / Allen Road Intersection in Zephyrhills
Final Route Study

4/26/05

Sweetbriar Drive
from Anclote Blvd to Baillie’s Bluff Road
Final Route Study

9/25/01

Zephyrhills West Bypass Extension
from SR 54 to Morris Bridge Road
Final Route Study

7/16/02