|
Approved Route Studies
Items in black are not available electronically |
Approval Date |
| Bell Lake Rd from Alpine Road to Sable Ridge Subdivision
Final Route Study |
07/26/05 |
Boyette Road from SR 54 to Overpass Road
Final Route Study |
2/24/04 |
|
Centennial Road @ U.S. 301 |
08/07 |
|
Chancey Parkway
from SR 581 to Morris Bridge Road
Final Route
Study
|
2/24/04 |
Christian Road from Powerline Road
to US 301 Final Route Study |
1/23/02 |
Clinton Avenue Extension
from east of McKendree Road to east of Pasadena Road
Final
Route Study
|
8/24/04 |
Clinton Avenue from SR 52 at
Prospect to US 301 Final Route
Study |
6/19/01 |
Collier Parkway from Hale Road to Parkway
Blvd Final Route Study
|
7/16/02 |
Collier Parkway from Parkway to
Ehren Cutoff
Final Route Study
Phase I
Contamination Assessment |
7/29/03 |
Colony/Coyote Roads from SR 52
to CR 578
Final Route Study |
9/24/02 |
CR 54 from SR 56 to North of Magnolia Final Route Study |
8/26/03 |
CR 578 / County Line Road (Hernando) from US 19 to US 41
Preliminary
Engineering Report
Appendix A
|
MPO
4/03 |
Curley Road from SR 54 to north of Overpass
Road Final Route
Study |
2/24/04 |
Curley Road from north of
Overpass Road to SR 52 Final Route Study
11x17 graphics
Appendix A - Drainage
Appendix B - Traffic Memorandum
Appendix C - Natural Environment
Appendix D - Curtural Resources
Appendix E - Contamination Assessment
Appendix F - Construction Cost Estimate
|
3/22/05
|
|
Curley Rd. S. from SR54 to North
of Wells Rd Final Reevaluation Route and Pond Study Appendix A
|
10/25/05 |
|
East Road from north of Sherman Drive to
County Line Road Final Route Study and Pond Siting |
12/07/04 |
|
Frazee Hill Road
Pond Siting Report |
4/10/07 |
|
Frazee Hill Road from 14th Street to US 301
Final Route Study
Report |
12/16/03 |
|
Gateway Boulevard
Extension Route Study |
3/13/07 |
Gunn Highway (County Road 587) Route Study
|
5/23/06 |
Hale Road from Collier Parkway to
Parkway Blvd Final Route Study |
9/17/02 |
Kossik Road / Otis Allen Road
from Ft. King Hwy to Wire Road
Final Route
Study
|
1/15/02 |
Lake Patience Road
from Kristen Lane (Oakstead) to US 41
Final Route Study
|
6/08/04 |
Moon Lake Road
from Decubellis to SR 52
Final Route Study
Moon Lake Road
from Decubellis to SR 52
Re-evaluation Route Study
|
5/22/03
1/11/05
|
Morris Bridge Road (C.R. 579)
from Pasco/Hillsborough County Line to North of S.R. 54
Final Route and Pond Study
|
1/23/07 |
Old Pasco Road
from Quail Hollow Blvd to SR 52
Final Route Study
|
5/06/03 |
Osteen Road from Plathe Road to Orchid
Lake Boulevard Final Route Study |
12/07/04 |
|
Overpass Road
from Old Pasco Road to Ft. King Highway
Final Route Study
Alignment O-1
Alignment O-2
Alignment O-3
A - Preliminary Drainage
B - Traffic
C - Natural Environment
D - Cultural Resources
E - Contamination Screening
F - Estimates and Engineering Information
|
4/26/05 |
|
Perrine Ranch Intersections
with Grand Boulevard and Seven Springs Boulevard
Final Route Study
Perrine Ranch
Road from Grand Boulevard to Seven Springs Boulevard
Final Route Study |
2/8/05 |
Penny for
Pasco 10 Intersection Improvements
SR 52 at Prospect/Happy Hill Roads
Final Route Study
Pond Siting Concepts
Congress Street/Orchid Lake Road/Pine Hill Road
Final Route Study
Grand Boulevard at Trouble Creek
Concept Plan - No R/W required.
Grand Boulevard at Moog Road
Concept Plan - No R/W required.
SR 54 at the Boyette Road Relocated
Final Route Study
Grand Boulevard at Mile Stretch Road
Final Route Study
US 19 at Fox Hollow Boulevard
Concept Plan - No R/W required.
Regency Park Boulevard at San Miguel Drive
Final Route Study
Collier Parkway at Weeks Boulevard
Concept Plan - No R/W required.
Little Road at Ponderosa
Concept Plan - No R/W required.
|
4/5/05 |
|
Penny
for Pasco Roadway Improvements
Final Route Study of Main Street (From Congress Street to Rowan
Road)
Pond Siting Analysis for Main Street (From Congress
Street to Rowan Road) |
6/27/06 |
Ridge Road
from Broad Street to Moon Lake Road
Final Route Study
|
5/22/01 |
Ridge Road Extension
from Moon Lake Road to CR 583/Ehren Cutoff
Final Route
Study
Alternative Site Analysis September 2001
Contamination Screening Report
Archaeological Report
Wetland Report
Wildlife Report |
10/14/97 |
| Shady
Hills Rd @ Peace Blvd. Final Intersection Report |
12/06/05 |
|
Shady Hills Road
from SR 52 to North County Line Final Route &
Pond Study |
4/24/07 |
|
SR 52 SEIR from I-75 (SR 93) to E.
of Emmaus Cemetery Road Final State Environmental Impact Report
Preliminary Engineering Report
Air Quality Memorandum
Noise Study Report
Cultural Resources Report
Traffic Report
Location Hydraulics Report
|
08-23-05 |
|
SR 54 SEIR from west of SR 581 to east of Curley
Road
Preliminary Engineering Report
State Environmental Impact Report
Air Quality Report
Contamination Screening Report
Endangered Species Biological Report
Final Pond Siting Report
Wetland Evaluation Report |
12/16/03 |
SR 54 / Allen Road Intersection in Zephyrhills
Final Route Study
| 4/26/05 |
Sweetbriar Drive
from Anclote Blvd to Baillie’s Bluff Road
Final Route
Study
|
9/25/01 |
Zephyrhills West Bypass Extension
from SR 54 to Morris Bridge Road
Final Route
Study
|
7/16/02 |