STORMWATER MANAGEMENT DIVISION

4454 Grand Blvd.
New Port Richey, Fl 34652
Phone: 727-834-3611


Ordinances/Resolutions   |   Map of Flood Prone Areas   |  Stormwater Utility Fee FAQ

DESIRED IMPACT:

To manage Pasco County’s Stormwater Utility in a cost effective and professional manner. To fulfill all requirements of the National Pollutant Discharge Elimination System (NPDES) permit issued to Pasco County by the U.S. Environmental Protection Agency. In conjunction with the Road and Bridge Department, improve infrastructure maintenance in the County. Manage large scale watershed models and the FEMA flood mapping update. Design and construct flood control projects. Improve surface water quality in the County as mandated by the Florida Department of Environmental Protection and the U.S. Environmental Protection Agency.

OPERATIONAL GOALS AND PROGRAMS:

The operational goals and programs of the Stormwater Management Division are:

  • Promptly respond to all citizen requests.

  • In the short term perform major stormwater maintenance with a contract maintenance crew. Longer term, increase the capability of the Road and Bridge Department.

  • Complete the inventory of the County’s stormwater infrastructure, create and maintain a Geographic Information System (GIS) database of the infrastructure.

  • Complete the watershed management studies for the County including the creation and adoption of up to date flood maps for each watershed.

  • Provide the plans, specifications and engineering services for the Best Management Practices (BMPs) as recommended in the watershed studies and promote their development and implementation.

  • Maximize Division funding by partnering with the Southwest Florida Water Management District (SWFWMD) in their cooperative funding program.

  • Prepare and submit annual reports to comply with the NPDES MS4 permit.

  • Educate the public on the effects of stormwater pollution and ways to improve stormwater quality.

Pasco County Home Page