BY COMMISSIONER ____________________ RESOLUTION NO. 08-308
A RESOLUTION BY THE BOARD OF COUNTY COMMISSIONERS OF PASCO COUNTY, FLORIDA, ENACTING NEW/REVISED FEES FOR DEVELOPMENT REVIEW DIVISION
________________________________________________________________
WHEREAS, under Florida Statutes, Chapter 163, the Pasco County Board of County Commissioners is authorized to enact, amend, and enforce zoning and land use planning regulations; and,
WHEREAS, under Section 903 of the Pasco County Land Development Code, the Board of County Commissioners of Pasco County is authorized to adopt by resolution all necessary fees for the implementation or enforcement of the Land Development Code; and
WHEREAS, the administration of those codes demand a substantial amount of effort and resources by the County for the purpose of determining compliance with those codes; and,
WHEREAS, the County has previously established fees for some of these services by Resolution Nos. 88-45, 84-321, 00-28, and 00-100 and by Ordinance Nos. 05-05, Fills, and Ordinance No. 05-039, Transportation Corridor Management ; and,
WHEREAS, those fees are currently deemed inadequate to cover the costs of providing these services; and,
WHEREAS, the following fee schedule has been developed by County staff to reflect appropriate charges for different applications, determinations, or reviews, based upon staff time to perform the services, reproduction costs, and site visit requirements.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Pasco County, Florida, in regular session duly assembled, does adopted the following schedule of fees to be charged by the Pasco County Development Review Division as follows:
I. General
A. Fees denoted for preliminary, stormwater management plan and report, construction and simultaneous review are based on the following:
1. Content review (as necessary)
2. One (1) technical review with comments generated
3. One (1) follow up technical review
Subsequent submittals shall be subject to the revision fee denoted on the schedule.
B. Unless otherwise noted review fees are payable upon development permit application.
C. Where work has commenced without obtaining a permit, the permit application fee shall be double.
D. Simple revisions are those that are for phasing changes, model center relocation, typical construction detail amendments, and other similar submittals as determined by the Division Engineer (Development Review) or the Development Director.
II. Class I Development/Non-Residential
|
Base Fee
|
|
$ 500.00 |
|
Additional: |
Conceptual
|
$ 200.00 |
|
|
Preliminary (non-MPUD)
|
$ 50.00/Acre |
|
|
Preliminary (MPUD)
|
$ 60.00/Acre |
|
|
Stormwater Management Plan and Report/Mass Grading
|
$ 300.00 |
|
|
Construction, including Stormwater Management Plan and Report
|
$ 300.00 plus $50.00/Acre |
|
|
Simultaneous (non-MPUD)
|
$ 300.00 plus $75.00/Acre
|
|
|
Simultaneous (MPUD)
|
$ 300.00 plus $90.00/Acre
|
|
|
Big Box Review
|
$ 200.00 |
|
|
Development Review Committee Hearing Required
|
$ 200.00 |
|
|
Development Review Committee Continuance Requested by Applicant
|
$ 300.00 |
|
|
Board of County Commissioners Hearing Required
|
$ 300.00 |
|
|
Revision, non-substantial
|
$ 25.00/Acre |
|
|
Revision, substantial
|
$ 50.00/Acre |
|
Simple Revision
|
|
$ 200.00 |
|
Plan Status Evaluation
|
|
$ 100.00 |
III. Class I Development/Residential
|
Base Fee
|
|
$ 500.00 |
|
Additional:
|
Conceptual |
$ 200.00 |
|
|
Preliminary (non-MPUD)
|
$ 1.00/lot |
|
|
Preliminary (MPUD)
|
$ 2.00/lot |
|
|
Stormwater Management Plan and Report/Mass Grading
|
$ 300.00 |
|
|
Construction, including Stormwater Management Plan and Report
|
$ 300.00 plus $1.00/lot |
|
|
Simultaneous (non-MPUD)
|
$ 300.00 plus $2.00/lot
|
|
|
Simultaneous (MPUD)
|
$ 300.00 plus $3.00/lot
|
|
|
Development Review Committee Hearing Required
|
$ 200.00 |
|
|
Development Review Committee Continuance Requested by Applicant
|
$ 300.00 |
|
|
Board of County Commissioners Hearing Required
|
$ 300.00 |
|
|
Revision, non-substantial
|
$ 0.50/lot |
|
|
Revision, substantial
|
$ 1.00/lot |
|
Simple Revision
|
|
$ 200.00 |
|
Plan Status Evaluation
|
|
$ 100.00 |
IV. Class II Development/Non-Residential
|
Base Fee
|
|
$ 600.00 |
|
Additional: |
Conceptual
|
$ 200.00 |
|
|
Preliminary (non-MPUD)
|
$ 50.00/Acre |
|
|
Preliminary (MPUD)
|
$ 60.00/Acre |
|
|
Stormwater Management Plan and Report/Mass Grading
|
$ 500.00 |
|
|
Construction, including Stormwater Management Plan and Report
|
$ 300.00 plus $50.00/Acre |
|
|
Simultaneous (non-MPUD)
|
$ 300.00 plus $75.00/Acre
|
|
|
Simultaneous (MPUD)
|
$ 300.00 plus $90.00/Acre
|
|
|
Big Box Review
|
$ 200.00 |
|
|
Development Review Committee Continuance Requested by Applicant
|
$ 300.00 |
|
|
Board of County Commissioners Hearing Required
|
$ 300.00 |
|
|
Revision, non-substantial
|
$ 25.00/Acre |
|
|
Revision, substantial
|
$ 50.00/Acre |
|
Simple Revisions
|
|
$ 500.00 |
|
Plan Status Evaluation
|
|
$ 150.00 |
V. Class II Development/Residential
|
Base Fee
|
|
$ 600.00 |
|
Additional:
|
Conceptual |
$ 200.00 |
|
|
Preliminary (non-MPUD)
|
$ 1.00/lot |
|
|
Preliminary (MPUD)
|
$ 2.00/lot |
|
|
Stormwater Management Plan and Report/Mass Grading
|
$ 500.00 |
|
|
Construction, including Stormwater Management Plan and Report
|
$ 300.00 plus $1.00/lot |
|
|
Simultaneous (non-MPUD)
|
$ 300.00 plus $2.00/lot
|
|
|
Simultaneous (MPUD)
|
$ 300.00 plus $3.00/lot
|
|
|
Development Review Committee Continuance Requested by Applicant
|
$ 300.00 |
|
|
Board of County Commissioners Hearing Required
|
$ 300.00 |
|
|
Revision, non-substantial
|
$ 0.50/lot |
|
|
Revision, substantial
|
$ 1.00/lot |
|
Simple Revision
|
|
$ 500.00 |
|
Plan Status Evaluation
|
|
$ 150.00 |
VI. Class IIIMRS Development
|
Base Fee
|
|
$ 500.00 |
|
Additional:
|
Preliminary |
$10.00/lot |
|
|
Preliminary with no construction required
|
$10.00/lot |
|
|
Preliminary with construction plan
|
$15.00/lot |
|
Revision
|
|
$ 200.00 |
|
Plan Status Evaluation
|
|
$ 50.00 |
VII. Class IIILFS Development
|
Base Fee
|
|
$ 500.00 |
|
Additional:
|
|
$10.00/lot |
|
Revision |
|
$ 200.00
|
VIII. Class IIIU Development
|
Base Fee
|
|
$ 600.00 |
|
Additional:
|
Conceptual |
$ 200.00 |
|
|
Preliminary (non-MPUD)
|
$ 2.00/lot |
|
|
Preliminary (MPUD)
|
$ 3.00/lot |
|
|
Stormwater Management Plan and Report/Mass Grading
|
$ 500.00 |
|
|
Construction, including Stormwater Management Plan and Report
|
$ 500.00 plus $2.00/lot |
|
|
Simultaneous (non-MPUD)
|
$ 500.00 plus $6.00/lot
|
|
|
Simultaneous (MPUD)
|
$ 500.00 plus $7.00/lot
|
|
|
Revision, non-substantial
|
$ 1.00/lot |
|
|
Revision, substantial
|
$ 2.00/lot |
|
Simple Revision
|
|
$ 200.00 |
|
Plan Status Evaluation
|
|
$ 200.00 |
|
Subdivision Request Determination
|
Research and Review, Written determination issued |
$ 100.00 |
IX. Class IV Development
|
Class I Mining Permit
|
Application |
$ 2,500.00 |
|
|
Modification |
$ 2,500.00
|
|
|
Permit Transfer |
$ 2,500,00
|
|
|
Annual Renewal/Inspection Fee
|
$ 2,600.00 |
|
Class II Mining Permit |
Application
|
$ 300.00 |
|
|
BCC Approval Required
|
$ 500.00 |
|
Class III Mining Permit |
Application
|
$ 200.00 |
|
Construction and Demolition Debris Disposal Facility
|
Application
|
$ 2,500.00 |
|
|
Modification |
$ 2,500.00
|
|
|
Permit Transfer |
$ 2,500.00
|
|
|
Annual Renewal/Inspection Fee
|
$ 2,600.00 |
X. Site Development Permit Issuance
|
|
Ready for issuance within 24-hours after application is received, excluding weekends and holidays
|
$ 150.00 |
|
|
Ready for issuance within 48-hours after application is received, excluding weekends and holidays
|
$ 100.00 |
|
|
Ready for issuance after 48-hours of receipt of application, excluding weekends and holidays
|
$ 50.00 |
This does not include the review of revised plans. Fee is payable upon receipt of site development permit.
XI. Model Center/Temporary Sales Trailer $ 200.00
XII. Concurrency Determination
|
Initial |
Submitted separate from a project application
|
$ 300.00 |
|
Renewal |
|
$ 300.00 |
XIII. Administrative Variance Requests
|
Zoning Setbacks
|
|
$ 100.00 |
|
Transportation Corridor
|
|
$ 250.00 |
XIV. Variance Requests
|
Base Fee |
Charged when variances are considered separate from the project application
|
$ 600.00 |
|
Request |
Each section of the Code
|
$ 200.00 |
XV. Alternative Standard Requests
|
Base Fee |
Charged when alternative standard requests are considered separate from the project application
|
$ 600.00 |
|
Request |
Each section of the Code
|
$ 200.00 |
XVI. Lot Drainage Permits
|
|
Submitted prior to construction
|
$ 80.00 |
|
|
After the fact permit applications
|
$ 250.00 |
XVII. Fill Permits
|
|
Submitted prior to construction
|
$ 80.00 |
|
|
After the fact permit applications
|
$ 250.00 |
XVIII. Right-of-Way Use Permits
|
Individual
|
Serving individual residential lot |
$ 30.00 |
|
Block Party
|
|
$ 100.00 |
|
Parade
|
|
$ 100.00 |
|
Road Closure
|
|
$ 120.00 |
|
License and Maintenance Agreements
|
|
$ 500.00 |
|
Development Project Connections
|
Where a development plan has been approved by Pasco County |
$ 200.00 |
|
|
Where a development plan is not located within the unincorporated Pasco County jurisdiction
|
$1,000.00 |
|
Utility Installation |
No Roadway Crossings
|
$ 100.00 |
|
|
With Jack and Bore Crossings
|
$ 120.00 |
|
|
With Open Cut Roadway Crossings
|
$ 200.00 |
XIX. Driveway Connection Permits
|
Individual |
Serving individual residential lot |
$ 30.00 |
|
|
|
|
XX. On-Street Parking Permits $ 30.00
XXI. Temporary Use Permits $ 100.00
XXII. Outdoor Festivals $ 500.00
XXIII. Flood Zone/Elevation Determinations
|
Written Determinations |
Existing individual structure with copy of any applicable Elevation Certificate and Letter of Map Revision/Amendment
|
$ 30.00 |
|
|
Land to be developed
|
$ 50.00 |
|
Copies of Elevation Certificate and Letter of Map Revision/Amendment |
Research and copies
|
$ 5.00 plus $0.15/page |
XXIV. House Moving Permit
|
Base Fee
|
|
$ 100.00 |
|
Additional: |
Escort Fee, if required by Traffic Operations
|
$ 200.00 first three hours |
|
|
|
$ 50.00 each additional hour |
XXV. Appeals
A. Staff Determinations $ 400.00
B. Development Review Committee Determinations $ 600.00
XXVI. Incorporated References
All guidance documents, publications, etc., issued by the Federal Emergency Management Agency, the State of Florida, and Pasco County, Florida.
This resolution shall take effect upon adoption.
DONE AND RESOLVED this 22nd day of July, 2008.
(SEAL) BOARD OF COUNTY COMMISSIONERS OF
PASCO COUNTY, FLORIDA
ATTEST:
_________________________________________ _________________________________________
JED PITTMAN, CLERK THEODORE J. SCHRADER, CHAIRMAN